Channel Rehabilitation and Spot Repair
![](images/channelRehabilitation.jpg)
GCE prepared construction plans, and bid documents for the proposed system repair work along Channels D140-03-00-X001 and D140-00-00-X013 within the project limits. Work included replacement of failed outfall pipes, construction of new interceptor structures, and channel slope repairs at the locations where failure of slope/erosion were noted.
GCE also reviewed the Project Manual prepared by HCFCD and assisted with the Pre-Bid conference.